Homes in Cadoc (CF63) at a glance
This page summarises 8,610 energy performance certificates (EPCs) for homes in Cadoc (CF63), using the most recent certificate for each home. 47% are rated D or lower.
The median floor area is about 83 m².
Half of these certificates were issued in 2020 or later, so most describe homes as they are now or were within the last few years.
What kinds of homes are here
Terraced homes make up 61% of certificates. Mid-terraces lose less heat through shared walls, but outdoor space can be tight, so where an outdoor unit can go and how it affects neighbours is often the deciding factor.
Who owns the homes here
Tenure is mixed: of the certificates that record it, 50% are owner-occupied, 25% privately rented and 25% socially rented. Who can approve an upgrade differs between those groups, so it is worth knowing which applies before asking for quotes.
Privately rented homes in England and Wales must currently reach at least an E rating to be let, with some exemptions, and are upgraded by their landlords, so landlords are the people to talk to about those homes.
Walls and insulation
37% of the sampled homes have solid walls. These lose more heat than insulated cavity walls and cannot be filled like a cavity, so options are internal or external wall insulation, which cost more and take more planning. A heat pump can still work in a solid-wall home, but a proper heat-loss survey matters, and it is worth asking installers how they sized the system.
Much of that is stone rather than brick: 23% of homes have sandstone, limestone, granite or similar walls. Stone walls usually need breathable (vapour-open) insulation materials, so ask installers how they would handle moisture.
How homes are heated
93% of homes use mains gas, so for most households a heat pump would be replacing a gas boiler. Whether that saves money depends heavily on the electricity and gas price gap, the home's insulation and how efficiently the system runs, so compare itemised quotes rather than headline claims.
Among the homes that are not on gas, electric heating is the most common, at 8% of all homes here. Homes on direct electric or storage heating usually see the biggest change in running costs from a heat pump, because the comparison is with full-price electricity.
When homes were built
37% of homes were built before 1930. Older homes are more likely to have solid walls, suspended timber floors and period features, and some may be in conservation areas or listed, which can affect what changes are permitted. It is worth checking this before getting quotes.
Lofts and windows
22% of homes with a roof of their own have no loft or roof insulation recorded, or less than 100 mm. For those homes a top-up to about 270 mm is the usual EPC recommendation.
Almost all homes here are double or triple glazed: 6% have any single glazing recorded.
Energy ratings
Most homes sit in bands C and D, with 10% rated E to G. For those homes the EPC recommendations are a useful check on which upgrades are still outstanding.
Improvements suggested for homes in Cadoc (CF63)
Across the 8,610 certificates here, the improvements suggested most often are solar panels for electricity (67%), solar water heating (59%) and floor insulation (49%).
A heat pump is suggested on fewer than 1% of certificates here, which says more about the assessment software than about the homes.
Solid wall insulation (internal or external) is suggested more often here than across Vale of Glamorgan: on 35% of certificates, against 22%.
Ask an installer about solar panels insulation
Heat pump grants across Vale of Glamorgan
Boiler Upgrade Scheme figures are published for local authorities, not postcode districts. Across Vale of Glamorgan, 229 heat pump installations have had a grant paid (May 2022 to September 2026).
Installers in and around Cadoc (CF63)
Companies House-registered installers listed for Cadoc: 36 installers have their registered office within 10 miles and 2 more say on their website that they work across Vale of Glamorgan. 8 of the 38 mention heat pumps.
The typical firm has been trading for 8 years (the median, from Companies House incorporation dates).
The first listed are Altum Organisation Limited, Evans Electrical Limited and Green Heat Wales Ltd.
Altum Organisation Limited
Says it fits air source heat pump, solar PV, battery storage, EV charging, loft insulation, solid wall insulation
Says it holds MCS, TrustMark, RECC, HIES, NICEIC, ISO 9001
Says it fits air source heat pump, solar PV, battery storage, EV charging
Says it holds MCS, NICEIC, Gas Safe, Constructionline
Green Heat Wales Ltd
Says it fits air source heat pump, solar PV, solar thermal, biomass, boilers
Says it holds MCS
CMC Electrics Limited
Says it fits air source heat pump, solar PV, battery storage, underfloor heating, boilers
Says it holds MCS, TrustMark, RECC, NAPIT
Spire Renewables Limited
Says it fits air source heat pump, ground source heat pump, air to air heat pump, solar thermal, battery storage, underfloor heating
Says it holds MCS
WDS Green Energy Ltd
Says it fits air source heat pump, ground source heat pump, solar PV, underfloor heating, boilers, cavity wall insulation
Says it holds TrustMark, RECC
Madley Plumbing and Heating Limited
Says it fits air source heat pump, ground source heat pump, water source heat pump, boilers
Tewdric Energy Ltd
Says it fits solar PV, battery storage, EV charging
Says it holds MCS, TrustMark, RECC, NAPIT
Urban Solar Limited
Says it fits solar PV, battery storage, EV charging
Says it holds MCS, TrustMark, RECC, NICEIC, ECA
OFF Grid Engineering Ltd
Says it fits solar PV, battery storage
Says it holds MCS, NAPIT
GES Green Solar Company (UK) Ltd
Says it fits solar PV, battery storage, EV charging
Says it holds MCS, TrustMark, HIES
Adexsi UK Ltd
Assured Electrical Solutions Limited
Complete Solar Services Ltd
Rhoose Electrical Services Ltd
Energy Renewable Solutions Ltd
Channel Electrical Systems Limited
Obrien Electrical Ltd
CP Electrical & Renewables Ltd
Nuvolt Ltd
Says it fits solar PV, battery storage, EV charging
Limegreen England & Wales Ltd
Cardo Group Limited
Says it fits solar PV
Says it holds PAS 2035, TrustMark
Reynolds Electrical Solutions Ltd
Carter Thomas Construction Ltd
These are the first 24 of 38: firms that name this area first, then those with a registered office nearby, then those that cover the wider area; heat pump firms and the nearest first within each.
Listed from each firm's own website and from Companies House records (contains public sector information licensed under the Open Government Licence v3.0). Being listed is not a recommendation, and what firms say about themselves has not been checked: ask for an installer's MCS certificate number and consumer code membership before you sign anything.
How Cadoc (CF63) compares with Vale of Glamorgan
Detached or semi-detached homes are less common here than across Vale of Glamorgan: 36% of certificates, against 57%.
Homes built before 1930 are more common here than across Vale of Glamorgan: 37% of certificates, against 23%.
Homes with solid walls are more common here than across Vale of Glamorgan: 37% of certificates, against 22%.
Advice written for Vale of Glamorgan as a whole may not fit Cadoc on these points.
Cadoc (CF63) and its neighbours
Barry (CF62) is about 2 miles away. Detached or semi-detached homes are more common there: 59% of certificates, against 36% in Cadoc.
Penarth (CF64) is about 3 miles away. Owner-occupied homes are more common there: 69% of certificates, against 50% in Cadoc.
Cardiff (CF5) is about 5 miles away, across the council border. Homes with solid walls are less common there: 15% of certificates, against 37% in Cadoc.
How Cadoc (CF63) ranks within Vale of Glamorgan
Of the 5 Vale of Glamorgan postcode districts with a page on this site, Cadoc (CF63) has the highest share of homes with solid walls (37%), the lowest share of homes with unfilled cavity walls (13%) and the lowest share of homes rated E, F or G (10%).
Grants and support (Wales)
The Boiler Upgrade Scheme rules (who qualifies, what it covers and how the installer applies) are summarised on the Vale of Glamorgan page, with a link to the official GOV.UK guidance.
Boiler Upgrade Scheme summary on the Vale of Glamorgan page →